Operating Projects

Box Springs Wind Project

Box Springs Wind Project

  • 6 MW windfarm located in Medicine Hat, Alberta
  • Commissioned in 2014 using three 78 m tall Gamesa G90 turbines
  • 20 year fixed price PPA with the City of Medicine Hat (“bundled” green electricity plus carbon offsets)
  • Largest windfarm in Canada built within a city boundary
  • WindRiver Power is the majority owner of the windfarm

Hunter Creek Hydro Project

  • 11 MW run-of-river hydro project located near Hope, B.C.
  • Commissioned in 2018 using single 6-jet vertical pelton turbine
  • 40 year fixed price PPA with BC Hydro (“bundled” green electricity plus carbon offsets)
  • Joint owners with the Shxw’owhámél First Nation and Connor, Clark and Lunn Infrastructure
Hunter Creek Hydro Project
Sakwi Creek Hydro Project

Sakwi Creek Hydro Project

  • 6 MW run-of-river hydro project located near Harrison Hot Springs, B.C.
  • Commissioned in 2014 using single 2-jet horizontal pelton turbine
  • 40 year fixed price PPA with BC Hydro (“bundled” green electricity plus carbon offsets)
  • Joint owners with the Sts’ailes First Nation and Connor, Clark and Lunn Infrastructure
  • 850 metres of gross head – 2nd highest in British Columbia